Melting equipement – Production of castingsmelting equipement

Technical specification:

  • induction medium-frequency furnaces ABP Dortmund 2×6 t and low-frequency heat preserving furnaces 2×4 t
  • The nominal output of the melting aggregate is 6 tons of melten metal per hour

Modification of nodular cast iron:

  • Spherulitic iron is produced in a new modification box with an automatic feeder of the modifying rod. Inoculation of cast iron with lamellar graphite performed with the help of a cored wire.

Casted materials

  • Lamellar cast iron (grey iron)
  • Nodular cast iron (ductile iron)